×

CityIngenieria's video: S10 COSTOS Y PRESUPUESTOS 5 Curso Taller

@S10 COSTOS Y PRESUPUESTOS (5) Curso Taller
Curso Taller: S10 COSTOS Y PRESUPUESTOS Sesion 2 - Video 5 Titulo: Partidas Existentes y Metrados Temas: Patidas Existentes en la Base del S10 Obras Preliminares Limpieza Manual del Terreno Movimiento de Tierra Excavacion Manual de Zanjas para Cimientos Concreto Simple Concreto Cimientos Corridos mezcla 1:10 Cemento - Hormigon + 30% Piedra Columnas Acero de Refuerzo Fy = 4200kg/cm2 Encofrado Concreto Columnas f´c = 175kg/cm2 Vigas Acero de Refuerzo Fy = 4200kg/cm2 Encofrado Concreto Vigas f´c = 210kg/cm2 Metrados S10 2005 S10 2003

95

11
CityIngenieria
Subscribers
32K
Total Post
166
Total Views
2.5M
Avg. Views
50.8K
View Profile
This video was published on 2014-01-23 06:29:34 GMT by @CityIngenieria on Youtube. CityIngenieria has total 32K subscribers on Youtube and has a total of 166 video.This video has received 95 Likes which are lower than the average likes that CityIngenieria gets . @CityIngenieria receives an average views of 50.8K per video on Youtube.This video has received 11 comments which are lower than the average comments that CityIngenieria gets . Overall the views for this video was lower than the average for the profile.

Other post by @CityIngenieria