×

Elite Earthworks LLC's video: Cutting Out Mud With The Takeuchi TB2150 For The Train Track

@Cutting Out Mud With The Takeuchi TB2150 For The Train Track
First day cutting out mud with the Takeuchi TB2150 for the train track base. I got the job at Diamond Grove Adventures to remove all the mud and soft ground to build a road base that will have a mid size train on it. It's a half mile loop that they have also added a 10' access road around the out side of the track so now I have a 20' wide cut about 2' deep for 2200' so a lot of material is coming out. I'm suppose to do my best to keep the topsoil and clay separated because they are trading out some of the topsoil for new clay coming in. I'm really liking the 2150 for the few hours I ran it today, it's very quick and smooth I can't wait to get the bigger bucket on it. Thanks for watching!

718

207
Elite Earthworks LLC
Subscribers
31.1K
Total Post
837
Total Views
578.6K
Avg. Views
6.3K
View Profile
This video was published on 2021-02-19 04:48:33 GMT by @Elite-Earthworks-LLC on Youtube. Elite Earthworks LLC has total 31.1K subscribers on Youtube and has a total of 837 video.This video has received 718 Likes which are higher than the average likes that Elite Earthworks LLC gets . @Elite-Earthworks-LLC receives an average views of 6.3K per video on Youtube.This video has received 207 comments which are higher than the average comments that Elite Earthworks LLC gets . Overall the views for this video was lower than the average for the profile.Elite Earthworks LLC #EliteEarthworks #Takeuchi #TB2150 has been used frequently in this Post.

Other post by @Elite Earthworks LLC