×

Engineers TV's video: Train Laying New Track

@Train Laying New Track
Please watch: "Peshawar BRT new Updates" https://www.youtube.com/watch?v=GulUT2uoli4 --~-- To minimize the time of track during a track renewal project, a track renewal train is used to automate most of the required process. Prior to the arrival of the track renewal train, preparation tasks must be completed. In some cases, the old rail needs to be cut into smaller segments and joined with fishplates. The rail fastening system may need to be released prior to its arrival. The new rails usually need to be prepared prior to the arrival of track renewal train. Rails are delivered to the center of the track. Those rail pieces are welded by track worker to form continuous welded rail (CWR) and left at the center of the track at the exact position required by the track renewal train to pick up at its arrival. A track renewal train has a series of machinery units that are combined together into one train. As the track renewal train moves forward, the track renewal process will be done stage by stage to the completion of track renewal as it leaves the area.

3

2
Engineers TV
Subscribers
2.3K
Total Post
115
Total Views
136K
Avg. Views
2.7K
View Profile
This video was published on 2018-03-19 20:43:08 GMT by @Engineers-TV on Youtube. Engineers TV has total 2.3K subscribers on Youtube and has a total of 115 video.This video has received 3 Likes which are lower than the average likes that Engineers TV gets . @Engineers-TV receives an average views of 2.7K per video on Youtube.This video has received 2 comments which are lower than the average comments that Engineers TV gets . Overall the views for this video was lower than the average for the profile.

Other post by @Engineers TV