Herb Lindberg's video: October 2020 Bridge Progress Part 2

@October 2020 Bridge Progress Part 2
As in the October Part 1 report, many aspects of the rehabilitation and restoration of the covered bridge across the South Yuba River at Bridgeport, CA are in process here: 1) excavate to expose south abutment 2015 stabilization deadman concrete and bond two groups of rebar into it to be joined to similar groups cast into the south abutment pile cap, 2) place south abutment pile cap concrete, 3) strengthen bonding of east rebar group into deadman concrete at north abutment, 4) continue dutchman repairs and altering geometry of framed buttress posts for both south and north portals 5) scarf together staggered step solid-wood sections that will constitute portal ends of bottom chords, 6) at top of bridge trusses continue installing tie beams, chord laminates, and cross braces, 7) assemble rebar and construct concrete forms for corner pilasters of south abutment front wall, 8) hang new floor beams in position below the bottom chords and begin drilling through these beams and bottom chords and bolting them together, 9) install south portal moment frame, 10) assemble rebar and construct concrete forms for south abutment front, back, and wing walls, 11) begin to install final seven replacement floor beams.

2

0
Herb Lindberg
Subscribers
342
Total Post
304
Total Views
7.7K
Avg. Views
94.5
View Profile
This video was published on 2020-11-06 04:07:41 GMT by @Herb-Lindberg on Youtube. Herb Lindberg has total 342 subscribers on Youtube and has a total of 304 video.This video has received 2 Likes which are higher than the average likes that Herb Lindberg gets . @Herb-Lindberg receives an average views of 94.5 per video on Youtube.This video has received 0 comments which are lower than the average comments that Herb Lindberg gets . Overall the views for this video was lower than the average for the profile.

Other post by @Herb Lindberg