×

Sayed Auf's video: Column Shortening in High Rise Buildings Part 4 of 5 ETABS Output to Final LT Report Arabic Based

@Column Shortening in High Rise Buildings Part (4 of 5)ETABS Output to Final LT Report(Arabic Based)
Real Tower 54 Stories Axial Shortening Study In Part (4) we are handling the ETAB out Procedure and creating the Final Long Term Shortening Report In the next Part (5), the Slab and Facade output will be explained. Note .. the Previous Video (Part (1,&3) Shall be realized properly prior to watch this video. Table of Content of this Video: Part (4) of (5) 1- Detailed explanation of Construction Sequence & LT Axial Shortening Stages & Operations.. 2- The Differences between the Construction Sequence & LT Axial Shortening Cases of Loading. 3- How to Read The Column Shortening Values by ETABS & The Report Format. 4- Comparison between 3- ETABS Models (Original, Reduced Strengths & Reduce Sizes) 5- How to Perform The Compensation in the ETABS Model ( Analysis-4) الشكر موصول للمهندس خالد فودة الذي قام بإعداد المحتوى العلمي للمحاضرات الخمسة

21

5
Sayed Auf
Subscribers
43.1K
Total Post
400
Total Views
140.2K
Avg. Views
2.4K
View Profile
This video was published on 2020-08-18 06:50:43 GMT by @Sayed-Auf on Youtube. Sayed Auf has total 43.1K subscribers on Youtube and has a total of 400 video.This video has received 21 Likes which are lower than the average likes that Sayed Auf gets . @Sayed-Auf receives an average views of 2.4K per video on Youtube.This video has received 5 comments which are higher than the average comments that Sayed Auf gets . Overall the views for this video was lower than the average for the profile.

Other post by @Sayed Auf