×

Sean Moore's video: Track work in Pierson Yard on the Val Valley MRR

@Track work in Pierson Yard on the Val Valley MRR.
Some track realignment in Pierson yard involves replacing two (2x) switches that have been previously soldered and blasted in place. We will demonstrate how to: * Remove switches that have been soldered and ballasted in place. * Clean up the roadbed with out destroying it. * Prepare switches for trouble free operation. * Reinstall the switches and lead tracks. * Clean weathered rail ends for soldering. * Solder and unsolder joints. * Talk about cutting sections of track (measure 2x and cut 3x times). * Weathering track. * Spreading ballast. * Gluing Ballast and scenery. Let me apologize as this is a long video. But it has a lot of good information about replacing track and even laying track and ballasting it right the first time. I think you will find this video to be vary informative.

10

1
Sean Moore
Subscribers
2K
Total Post
155
Total Views
163.2K
Avg. Views
3.3K
View Profile
This video was published on 2017-04-03 21:25:33 GMT by @SleeTheSloth on Youtube. Sean Moore has total 2K subscribers on Youtube and has a total of 155 video.This video has received 10 Likes which are lower than the average likes that Sean Moore gets . @SleeTheSloth receives an average views of 3.3K per video on Youtube.This video has received 1 comments which are lower than the average comments that Sean Moore gets . Overall the views for this video was lower than the average for the profile.

Other post by @SleeTheSloth