×

Southwestern Pennsylvania Commission's video: Green Tree Borough Greentree Rd SINC-UP Project Summary

@Green Tree Borough Greentree Rd (SINC-UP) Project Summary
View the Project Summary here: https://www.spcregion.org/wo11_green-tree/ The Greentree Borough Signals In Coordination with Equipment Upgrades (SINC-UP) Project is a traffic signal project with the goal of optimizing signal operations at intersections along the Greentree Rd (SR 121) corridor while considering all users of the intersections. As part of this project, many intersections received new signal controllers and/or cabinet assemblies, battery backup and/or electrical services, and emergency vehicle preemption. Ethernet Radios and/or Global Positioning Satellite antenna and receivers were installed at the intersections to allow for coordination. Coordination of traffic signal is one of the most cost effective ways of improving traffic flow along a corridor. The results showed the average PM Peak travel time improved over 20%. On average, southbound stops improved by 50% during the weekday peaks. Learn more at https://www.spcregion.org! https://www.facebook.com/spcregion/ https://twitter.com/spcregion

0

0
Southwestern Pennsylvania Commission
Subscribers
59
Total Post
328
Total Views
3.9K
Avg. Views
77.9
View Profile
This video was published on 2020-03-26 23:19:55 GMT by @Southwestern-Pennsylvania-Commission on Youtube. Southwestern Pennsylvania Commission has total 59 subscribers on Youtube and has a total of 328 video.This video has received 0 Likes which are lower than the average likes that Southwestern Pennsylvania Commission gets . @Southwestern-Pennsylvania-Commission receives an average views of 77.9 per video on Youtube.This video has received 0 comments which are lower than the average comments that Southwestern Pennsylvania Commission gets . Overall the views for this video was lower than the average for the profile.

Other post by @Southwestern Pennsylvania Commission