×

The Dawn's video: Udhampur Srinagar Baramulla Railway Link USBRL project status The Dawn

@Udhampur Srinagar Baramulla Railway Link | USBRL project status | The Dawn
Udhampur Srinagar Baramulla Railway Link | USBRL project status | Chenab bridge update Shri Piyush Goyal, Minister for Railways and Commerce & Industry and Consumer Affairs, Food & Public Distribution reviewed the progress of Udhampur-Srinagar-Baramulla Rail link Project (USBRL) recently Hon’ble Minister was apprised that the budget of USBRL for year 2021-22 is Rs. 4200 Cr. Honble MR instructed that there would not be any constraints of budget to this project. About the Udhampur-Srinagar-Baramulla Rail link Project (USBRL) ❖ Project background: Udhampur-Srinagar-Baramulla Rail link Project (USBRL) having length of 272 Km long Railway Line from Udhampur to Baramulla joining the Kashmir valley with rest of the country and has been declared as National Project in 2002. i. Udhampur - Katra -25km (commissioned in July 2014) ii. Quazigund - Baramulla – 118km (commissioned in Oct., 2009) iii. Banihal - Quazigund – 18km (commissioned in June 2013) iv. Katra to Banihal- 111km in progress (Target 2022-23) ❖Katra- Banihal Section of USBRL Project The work on intervening stretch of Katra-Banihal section (111 km) is in progress and this section predominantly involves tunnelling i.e. 97 Km out of 111 Km (i.e. 87%) of length of Katra-Banihal section is in tunnels and maximum length of tunnel T-49 is 12.75 Km. There are 27 nos. of Main tunnel having length of 97.6 Km and 8 nos. of Escape tunnel having length of 66.4 km, with cumulative length of about 164 Km of tunneling are being constructed in Katra- Banihal section. At present 140.81 Km of tunnelling i.e. 84.2 Km (20 nos.) out of 97.6 Km (27nos.) of Main tunnel and 56.61 Km (3 nos.) out of 66.4 Km (8 nos.) have been completed). There are 37nos. of Bridges (combined length of 7 Km) and includes 26 nos. major bridges and 11 nos. minor bridges. These bridges include the iconic Chenab Bridge (Overall length 1315 m, Arch span of 467 m and height of 359 m above river bed) which will be the highest railway bridge in the world. ❖ Major Achievement during April 21 & May21 ● Chenab Bridge- Arch closure of world highest Railway Bridge was successfully carried out in April. ● Anji Bridge –Main Pylon concreting: 4m lift in April 2021 and 4m lift May 2021 (upto 24st). Total progress of Main Pylon is 130m completed out of 193m. Cumulative assembly of segments (55m) and launching of 30m has been achieved. ● At Br. 39 in Reasi area, launching of 32m length done in April 21 and 15m in May 2021 (upto 24stError! Filename not specified.. ● Bridge No. 43 in Bakkal (Reasi) area, launching of 42.5m length in April 2020 and 9m in May 2021 (upto 21st). ● 1.46Km Tunnel Mining (MT+ET) done in April 2021and 0.78Km in May 21 (upto 24st) Major Achievement of 2020-21 ● Total Tunnel Mining of 14.97Km (MT +ET) done in Year 2020-21. ● Breakthrough of Tunnel T2 (Main tunnel) having a length of 5093m length achieved on 3rd Aug.’2021. ● Break Through of Tunnel No T-74R (Main Tunnel) having length of 8.6 KM achieved on 03.10.2020, which is 2nd longest tunnel constructed on USBRL Project after PirPanjal Tunnel (11.2 Km). ● Break Through of Tunnel No T-74R (Escape Tunnel) having length of 7.41 KM achieved on 05.12.2020. ● Bridge No. 88, (1x45.7m) was completed in Oct.’2020. ● Bridge No. 138 3x 30.5 m, has been completed in the month of Nov.’20. ● Bridge No. 59, (1x30.5 + 1x45.7 + 1x30.5m) has been completed in March’2021 ● Total Bridge Fabrication of 15,480 MT was achieved during this financial year, which is the record highest fabrication achieved so far in any financial year. ● Total Bridge Launching/Erection of Superstructure of 15,520 MT achieved during FY 2020-21, which is record highest launching so far in any financial year ❖ Electrification of Banihal- Baramulla section: The 136 km railway line from Banihal to Baramulla has already been commissioned and its electrification work has also been sanctioned. All tenders have been awarded and S&T plans have also been approved and work is under progress. The target for completion of Railway Electrification works in Banihal-Baramulla section is March-2022. Completion date of the project is April-2023. This video covers banihal to srinagar, udhampur- srinagar- baramulla - rail- link (usbrl) project, srinagar railway, udhampur-srinagar-baramulla rail link line, jammu katra kazigund udhampur srinagar baramulla rail line, udhampur srinagar-baramulla rail link project, katra to banihal rail line, kashmir railways, chenab bridge update, chenab bridge, anji bridge latest update, the dawn, usbrl project status, bharatmala project progress, usbrl project j&k, usbrl project,

4.6K

195
The Dawn
Subscribers
280K
Total Post
210
Total Views
23.9M
Avg. Views
68.1K
View Profile
This video was published on 2021-06-12 08:30:06 GMT by @The-Dawn on Youtube. The Dawn has total 280K subscribers on Youtube and has a total of 210 video.This video has received 4.6K Likes which are higher than the average likes that The Dawn gets . @The-Dawn receives an average views of 68.1K per video on Youtube.This video has received 195 comments which are higher than the average comments that The Dawn gets . Overall the views for this video was lower than the average for the profile.The Dawn #thedawn #usbrl #chenabbridge #indianrailways has been used frequently in this Post.

Other post by @The Dawn