YZ MM's video: 90 Work Completed of 11 Stations of Mumbai Metro Line 3 75 Overall Work Completed

@90% Work Completed of 11 Stations of Mumbai Metro Line 3 | 75% Overall Work Completed 🔥🔥🔥
Dinesh Naik Instagram ID – https://www.instagram.com/d_naik24/ Special Thanks to Mumbai Metro Rail Corporation - MumbaiMetro3 For the Footages According to a recent development, the underground work for 11 stations on the Mumbai Metro 3 Line has been completed to 90 percent. The Mumbai Metro Rail Corporation (MMRC), the project's implementing authority, provided an update on the project's current status. Aside from completing the civil works at all stations, other related works such as electric fitting and track laying work, among others, have also been completed concurrently. All 11 stations' civil work is expected to be completed in the first four months of 2022. According to MMRC, the work on MIDC Metro Line 3 stations has been completed by 88 percent, SEEPZ and Vidhan Bhavan station is 86 percent ready, Marol Naka, Cuffe Parade, and Siddhivinayak station works are completed by 84 percent, Churchgate is 83 percent complete, Mahalaxmi, Worli, Mumbai Central, and Sahar Road domestic Airport stations are 80-85 percent ready, and CSMT, Dadar, Dharavi, Science Along with finishing the Metro Line 3 station work, Japan imported track laying work has begun. 11 kilometres of track work has already been completed. For the first time, such Low Vibration Track (High Attenuation) technology is being used for track construction in India. M/s Sonneville AG, a Swiss company, designed this system to reduce higher levels of noise and vibration in the range of 22VdB (vibration measurement) generated during train operations on this line. The underground Metro Line 3 will be 33.5 kilometres long, both up and down, with 10,754 metric tonnes of specially designed Japan imported tracks installed. Meanwhile, while Metro Line 3 construction is progressing, the contentious crash site remains unresolved. The Mahavikas Aghadi government of Chief Minister Uddhav Thackeray has relocated the crash site from Aarey to Kanjurmarg, but no work has begun due to State and Central Government issues. Copyright Related Issue Please Contact naikdinesh24@gmail.com OR DM on Instagram- https://www.instagram.com/d_naik24/ *DISCLAIMER* CLIPS / IMAGES USED IN THE VIDEO ARE -ROYALTY FREE -IN PUBLIC DOMAIN -CREATIVE COMMONS -COMMON OWNERSHIP GIVEN BY GOVERMENT OF INDIA Video is for educational purpose only. Copyright Disclaimer under section 107 of the copyright Act 1976, allowance is made for "fair use" for purpose such as criticism, comment, news reporting, teaching, scholarships, and research. Fair use is a use permitted by copyright statute that might otherwise be infringing. Non-profit, educational or personal use tips the balance in favor of fair use.

448

76
YZ MM
Subscribers
44.1K
Total Post
112
Total Views
714.4K
Avg. Views
6.9K
View Profile
This video was published on 2021-12-23 17:25:20 GMT by @YZ-MM on Youtube. YZ MM has total 44.1K subscribers on Youtube and has a total of 112 video.This video has received 448 Likes which are higher than the average likes that YZ MM gets . @YZ-MM receives an average views of 6.9K per video on Youtube.This video has received 76 comments which are higher than the average comments that YZ MM gets . Overall the views for this video was lower than the average for the profile.YZ MM #mumbaimetrolatestupdate #mumbaiundergroundmetro #bandacollabaseepzmetro #mumbaimetroline3updates #mumbaimetro #mumbaimetrolines #mumbaimetrostockfootages #navimumbaimetro #mumbaitransharbourlinklatest #csmtundergroundmetro #mumbaimetroline3 #mumbaiundergroundmetroupdate #mumbaimetrotrail #navimumbaimetro #aqualinemumbaimetro Copyright has been used frequently in this Post.

Other post by @YZ MM