@Meeting with Bruno Kapandji
Unofficial Transcript: Meeting International Rivers – Bruno Kapanji, 5/9/2016 Clip 1 (from 0.00 to 1.11) Inga 3 is here to meet a need, but Inga will not resolve the energy poverty in the country, that is why we have in place the ministry of Energy to improve the country's access to electricity - supply electricity to people, government institutions and also for export, because we need money, don't we! Today the price of commodities is falling and we need revenue - If we have a lot of energy to export like Canada and Uruguay we won't have a problem. Clip 3 (1.25 to 1.57) DRC is unfortunate, we are always a leader in finding solutions, but implementation on the ground is always slow. Inga 3 will produced almost 3000 MW, 1000 in the region and a 1000 in the South for the mines etc. Clip 4 (1.57 to 02.12) Our industry cannot develop because of lack of energy, this is a concern for us. Clip 7 (3.50 to 4.37) The Congo river has a regular flow throughout the year of 42,000 cubic meter/s and the Bundi valley will be designed in a way that the turbines will operate at maximum capacity. That is why we work with the best consultants - Aecom, Tractabel etc to mitigate the impacts. Clip 9 (5.08 to 5.21) Inga is a Congolese project located in Congo, you have to think as a Congolese, as a Congolese we have no choice but to build Inga 3. And for the cities in Kinshasa, Bas-Congo and Katanga, Inga 3 is the only solution. (9.36 to 10.36) Q. What is the current state of the project? A. At this stage we are preparing the files (technical, legal, commercial and financial) to make the following things happen - 1st to start the project as soon as possible, and 2nd select the consortium asap. According to our experts it is possible to start with (at least construction of workers camp etc) in November or December 2016. (10.36 to 10.58)  The World Bank already told you that they do not want to finance the project because of this and that - but we are looking for a solution that is why President Kabila took matters into his own hands, and that is why we are looking at how to carry the studies, then I asked the NGOs, why can't you commission or finance these studies? You only know how to ask questions! (16.50 to 20.16) Q. Do you think that between May and December all the studies will be completed, it is expected that all studies are completed before construction begins? A. It is a choice to make, people have no electricity and same for the industries, we set an objective - we have to produce energy. The government progamme talks about adding online  20.000 MW by 2035, but the government here has set an objective to produce at least 5000 MW, I am sure we won’t reach these goals, but there are stages - today we can produce 50 Mw, then after 20 Mw, 30 Mw and so on... and in the letter concerning Inga 3, it says that by 2020 we have to supply certain amount of electricity to the Congolese people, mines in Katanga and to South Africa - this is a legally binding commitment, and we are running late - There are a lot of studies to carry, at least 18, and we favor some studies over others based on priority, and to allow us to do the following - 1st to develop a tender document that will be technically and financially acceptable and also for the candidate to prepare their offer, that should be credible and reliable, and favor both parties. (Translation Ange Asanzi, International Rivers) International Rivers protects rivers and defends the rights of communities that depend on them. We oppose destructive dams and encourage better ways of meeting people's needs for water, energy and protection from damaging floods. Visit our web page to learn more about and support International Rivers. http://www.internationalrivers.org/ Connect with us on social media: Facebook https://www.facebook.com/InternationalRivers Twitter https://twitter.com/intlrivers Instagram https://www.instagram.com/intlrivers/

1

1
internationalrivers
Subscribers
2.6K
Total Post
200
Total Views
74.1K
Avg. Views
0.9K
View Profile
This video was published on 2016-05-27 21:32:33 GMT by @internationalrivers on Youtube. internationalrivers has total 2.6K subscribers on Youtube and has a total of 200 video.This video has received 1 Likes which are lower than the average likes that internationalrivers gets . @internationalrivers receives an average views of 0.9K per video on Youtube.This video has received 1 comments which are higher than the average comments that internationalrivers gets . Overall the views for this video was lower than the average for the profile.

Other post by @internationalrivers