×

YZ MM's video: India s Bullet Train Longest Bridge to be Completed by 2024 Trial Runs from 2026

@India's Bullet Train Longest Bridge to be Completed by 2024 | Trial Runs from 2026
Instagram I'd - https://www.instagram.com/d_naik/ The longest bridge on the 508-kilometer Bullet Train track will be a 1.2-kilometer span across the Narmada River near Bharuch, Gujarat. The bridge is expected to be finished by June 2024, according to the National High-Speed Rail Corporation Limited (NHSRCL). They further stated that all 20 bridges currently under construction in Gujarat across various rivers will be completed by June 2024. "In comparison to the construction of a bridge across any river, the use of cutting-edge technologies will cut the construction period in half. We want to have it finished by 2024 "NHSRCL's Principal Executive Director, Pramod Sharma, stated. Sharma was also a member of the team that built the Jammu-Udhampur-Katra highway. According to NHSRCL, the bullet train will traverse rivers like as the Narmada, Sabarmati, Mahi, Par, Kaveri, Purna Ambika, Daroatha, Daman Ganga, Kolak, Mindhola, Anuraga, Kharera, Tapi, Kim, Dhadhar, Vishwamitri, Mohar, Vatrak, and Meshwa, requiring a total of 20 bridges. "The Narmada will have the longest bridge, followed by Tapi and Mahi, each of which will be roughly 720 metres long. By June 2024, we hope to have completed all bridge construction work "he stated Sharma went on to say that two temporary Access Bridges with an eight-meter width and a 60-meter spacing between them are being built for the purpose of drilling wells inside the Narmada river stream (water wells) to allow passage. "The Narmada River has a tidal influence, which could have hampered river building. So, to counteract the effect of rising water levels during the monsoon, we built a temporary access bridge at a specified height. We can now work 24 hours a day, 365 days a year "Added he. The trial run on the Gujarat section of India's first-ever Bullet Train corridor, the Mumbai-Ahmedabad High-Speed Rail route, would commence in 2026, according to NHSRCL's MD, SC Agnihotri. Public services, on the other hand, will be available by 2027. The train's maximum operational speed will be 320 km/h. Copyright Related Issue Please Contact naikdinesh24@gmail.com OR DM on Instagram- https://www.instagram.com/d_naik/ *DISCLAIMER* CLIPS / IMAGES USED IN THE VIDEO ARE -ROYALTY FREE -IN PUBLIC DOMAIN -CREATIVE COMMONS -COMMON OWNERSHIP GIVEN BY GOVERMENT OF INDIA Video is for educational purpose only. Copyright Disclaimer under section 107 of the copyright Act 1976, allowance is made for "fair use" for purpose such as criticism, comment, news reporting, teaching, scholarships, and research. Fair use is a use permitted by copyright statute that might otherwise be infringing. Non-profit, educational or personal use tips the balance in favor of fair use.

108

7
YZ MM
Subscribers
44.1K
Total Post
112
Total Views
714.4K
Avg. Views
6.9K
View Profile
This video was published on 2022-04-15 18:04:06 GMT by @YZ-MM on Youtube. YZ MM has total 44.1K subscribers on Youtube and has a total of 112 video.This video has received 108 Likes which are lower than the average likes that YZ MM gets . @YZ-MM receives an average views of 6.9K per video on Youtube.This video has received 7 comments which are lower than the average comments that YZ MM gets . Overall the views for this video was lower than the average for the profile.YZ MM #bullettrainprojectindia #bullettrainindia #bullettrainlatestupdate #indiajapan #7hsrstations #bullettrainconstruction #bullettrainindiadrone #bullettraintenders #sabarmatistationbullettrain #mumbaiahemdabadbullettrain #indiabullettraindate #indiahighspeedtrain #bullettrainbkcundergroundtunnel #bullettraintunnel #bkctunnel #bullettraintraininginstitute #bullettrainlongestbridge #narmadanadibullettrain #bullettrainbharuch #bulletrtrainbridge Copyright has been used frequently in this Post.

Other post by @YZ MM